Energy Wizard Controller -Network Editor - Priority
The Controller Network Editor - Priority tab allows the operator to change the priority of each load within their respective group.
To change the priority of a load first select the load and then "Set New Priority Level" as required.
Click on the Accept button to accept the changes.