Energy Wizard Controller -Network Editor - Priority

The Controller Network Editor - Priority tab allows the operator to change the priority of each load within their respective group.

CN-Priority.gif (12583 bytes)

To change the priority of a load first select the load and then "Set New Priority Level" as required.

Click on the Accept button to accept the changes.